Spec the system. We tell you if it fits before it ships.

Zone by zone, with your framing, your line set runs, your pad, and your panel. Every answer carries the measurement behind it, so you can check our work instead of taking our word for it.

Fit against real framing

Enter the member and on-center spacing. We check the unit’s net dimensions against the clear bay and tell you whether anything gets cut.

Published matchups, not guesses

Head combinations are checked against MrCool’s chart. Where no chart exists, we say so instead of implying approval.

Circuit and pad sized

Breaker, conductor, disconnect adequacy, and whether the condenser fits the pad that is already poured.

Priced and stock-checked

A bill of materials with live pricing and on-hand quantities, so nothing on the list is vapour.

Project

Outdoor unit

Pick the condenser first — it fixes the generation, refrigerant, and voltage every indoor unit has to match.

Zones

One per indoor unit. Framing matters wherever a unit recesses into the building.

Site conditions

Optional, but each one turns a caution into a verified answer.

Verification

Choose a condenser and an indoor unit for every zone. The check runs on its own as you go — capacity, matchup chart, framing fit, line sets, pad, and branch circuit.

Build desk

Every answer is looked up against the live catalog and run through the fitment engine. If we do not have the data, it says so.

Try

Running a bigger job?

Multi-building, repeated unit types, or 100+ units — send the plans and we will spec it, verify every unit type, and quote the whole package with lead times and staged delivery.